Featured Posts

  • Serinus Energy plc – Operational Update

    Serinus Energy plc – Operational Update

    Serinus Energy plc (“Serinus”, “SEN” or the “Company”) (AIM:SENX, WSE:SEN), announces an operational update. Romania The Moftinu gas plant is completed and able to operate at pressure with sustained production, but is waiting for the installation of the Low Temperature […]

     
  • KMG International – CIPS accreditation in procurement

    KMG International – CIPS accreditation in procurement

    KMG International Group (Group or KMGI) has become the first company in Romania, which was awarded “Standard” accreditation level by CIPS (Chartered Institute of Procurement and Supply). The Certification of this level shows that the Group has robust and professional […]

     
  • ANRE Order 176/2018 (translation available)

    ANRE Order 176/2018 (translation available)

    The Official Journal of Romania Part I no. 876 of 17 October 2018 The National Regulatory Authority for Energy – ANRE Order no. 176/2018 amending the Annex to the Order of the President of the National Regulatory Authority for Energy […]

     
  • Separation of capacity booking on entry/exit points in the New Network Code on gas transmission. Episode 2

    Separation of capacity booking on entry/exit points in the New Network Code on gas transmission. Episode 2

    by Dumitru Chisalita The New Network Code separates the capacity booking activity in entry points and exit points of the NTS, introducing the healthy principle under which the gas producer/owner of imported gas will introduce it in the NTS and only […]

     
 
 
 
 

Recent Posts